<?xml version="1.0" encoding="UTF-8" standalone="no"?>
<?xml-stylesheet type="text/xsl" href="../../styles/reactor.xsl" ?>
<!DOCTYPE TEI.2 SYSTEM "../../dtds/teixlite.dtd"[
<!ENTITY % DONRstatus080152 SYSTEM "DONRstatus080152.ent" >
%DONRstatus080152;
]>

<TEI.2 id="DONRstatus080152">

<teiHeader>

<fileDesc>

<titleStmt>
<title type="245">Current Status of Construction on the Nuclear Reactor and the Nuclear Reactor Building at North Carolina State College, with photographic enclosures.</title>
<title type="gmd">Machine readable transcription</title>
<author>Beck, Clifford K.</author>
<respStmt>
<resp>Creation of machine-readable version:</resp>
<name>James M. Jackson Sanborn</name>
<resp>Creation of digital images:</resp>
<name>James M. Jackson Sanborn</name>
<resp>Conversion to TEI.2-conformant markup:</resp>
<name>James M. Jackson Sanborn</name>
</respStmt>
</titleStmt>

<extent>ca. 20 kilobytes</extent>

<publicationStmt>
<publisher>NCSU Libraries</publisher>
<pubPlace>Raleigh, NC</pubPlace>
<idno type="ETC">DONRstatus080152</idno>
<availability>
<p>Publicly accessible</p>
<p n="public">URL: http://www.lib.ncsu.edu/archives/etext</p>
<p>copyright 2000, by North Carolina State University</p>
</availability>
<date>August 19, 2000</date>
</publicationStmt>

<seriesStmt>
<p></p>
</seriesStmt>

<notesStmt>
<note>Images of the document pages have been included.</note>
</notesStmt>

<sourceDesc>
<biblFull>
<titleStmt>
<title>Current Status of Construction on the Nuclear Reactor and the Nuclear Reactor Building at North Carolina State College, with photographic enclosures.</title>
<author>Clifford Beck</author>
<respStmt>
<resp></resp>
<name></name>
</respStmt>
</titleStmt>
<editionStmt>
<p></p>
</editionStmt>
<extent>6 pp.</extent>
<publicationStmt>
<publisher></publisher>
<pubPlace></pubPlace>
<date></date>
<idno>Manuscript copy consulted UA 105.1</idno>
</publicationStmt>
<seriesStmt>
<p>Nuclear Reactor</p>
</seriesStmt>
<notesStmt>
<note></note>
</notesStmt>
</biblFull>
</sourceDesc>
</fileDesc>

<encodingDesc>
<projectDesc>
<p>Prepared for the North Carolina State University Science and Technology Electronic Text Center</p>
</projectDesc>
<editorialDecl>
<p>The lineation of the manuscript has been maintained and all end-of-line hyphens have been preserved.</p>
<p>Keywords in the header are a local Science and Technology Electronic Text Center scheme to aid in establishing analytical groupings.</p>
</editorialDecl>
<refsDecl>
<p> </p>
</refsDecl>
<classDecl>
<taxonomy>
<bibl>
<title>Library of Congress Subject Headings</title>
</bibl>
</taxonomy>
</classDecl>
</encodingDesc>

<profileDesc>
<creation>
<date>August 1, 1952</date>
</creation>
<langUsage>
<language id="en">English</language>
</langUsage>
<textClass>
<keywords>
<term></term>
</keywords>
<keywords>
<term>LCSH</term>
</keywords>
<keywords>
<term id="visual-work">manuscript</term>
<term id="format">24-bit color: 400 dpi</term>
</keywords>
</textClass>
</profileDesc>


</teiHeader>

<text id="DONRstatus080152T">


<front>
<div1 type="summary" n="1">
<head rend="center">Current Status of Construction on the Nuclear Reactor and the Nuclear Reactor Building at North Carolina State College, with photographic enclosures.</head>
<p></p>
</div1>
</front>



<body>
<div1 type="report" n="1">
<head></head>

<pb n=""/>
<p><seg><xref id="DONRstatus080152a.jpg" rend="new">
<figure entity="DONRstatus080152a"></figure></xref></seg>
</p>

<p>NCSC #54
</p>
<p>CURRENT STATUS OF CONSTRUCTION <lb/>
ON THE <lb/>
NUCLEAR REACTOR AND THE <name type="place">NUCLEAR REACTOR BUILDING</name> <lb/>
AT <lb/>
<name type="corporate">NORTH CAROLINA STATE COLLEGE</name>

</p>
<p><date value="1952-08-01">August 1, 1952</date></p>

<p><name type="person">Clifford Beck</name>, Chairman<lb/>
<name type="corporate">Physics Department</name>
</p>


<pb n=""/>
<p><seg><xref id="DONRstatus080152b.jpg" rend="new">
<figure entity="DONRstatus080152b"></figure></xref></seg>
</p>




<p>CURRENT STATUS OF CONSTRUCTION <lb/>
ON THE <lb/>
NUCLEAR REACTOR AND THE <name type="place">NUCLEAR REACTOR BUILDING</name> <lb/>
AT <lb/>
<name type="corporate">NORTH CAROLINA STATE COLLEGE</name></p> 

<list><item>1. INTRODUCTION
<p>The Nuclear Reactor Project at <name type="corporate">North Carolina State College</name> has had <lb/>
two separate parts:  (1) Construction of the Nuclear Reactor, and (2) <lb/>
Construction of a <name type="place">Reactor Building</name> in which the reactor and its associated <lb/>
laboratories are to be housed.</p>

<p>At the outset, it was proposed that the Nuclear Reactor be constructed <lb/>
(at an estimated cost of $150,000) in one of the buildings already existing <lb/>
on the campus.  A considerable portion of the design of the Reactor was <lb/>
completed with this in mind.  Later, through a generous gift of $200,000 <lb/>
from the <name type="corporate">Burlington Mills Foundation</name>, augmented by additional funds from <lb/>
the <name type="corporate"><orig reg="North Carolina State College">College</orig></name>, a $380,000 laboratory building to house the Reactor was assured <lb/>
for the project.  Availability of this specially designed building, contain-<lb/>
ing associated laboratories and auxiliarly equipment, will increase tremendously <lb/>
the value and usefulness of the project.</p></item>
<item>
2.  SEQUENCE OF CONSTRUCTION
<p>Thus chronologically, plans for the Reactor itself were developed well <lb/>
in advance of those for the <name type="place">Reactor Building</name>.  It might be mentioned also, <lb/>
that considerable delay was encountered in crystallizing the architectural <lb/>
<pb n="2"/>
<seg><xref id="DONRstatus080152c.jpg" rend="new">
<figure entity="DONRstatus080152c"></figure></xref></seg>


plans of the <name type="place">Reactor Building</name>, and in selecting construction contractors.</p>

<p>In view of this situation, request was made, and permission was granted, <lb/> 
for construction of the Reactor to get under way even before final details <lb/>
of the building plans had been drawn.  On <date value="1951-05-12">May 12, 1951</date>, therefore, excavation <lb/>
of the Reactor (and Building) site was started, and in June, 1951 the <lb/>
<name type="corporate">Southeastern Construction Company</name> began construction of the concrete Reactor <lb/>
foundations and the floor for the Reactor Room.  When this work was completed, <lb/>
the same company was requested to erect the concrete shielding of the Reactor <lb/>
Assembly.  Working at a rather slow pace, the shielding was completed in <lb/>
December, 1951.</p>

<p>The first attached photograph shows the Reactor shielding structure <lb/>
(essentially completed).  This photograph was made in November, 1951.</p>
</item>
<item>3. PRESENT STATUS
<p>The <name type="corporate">Wrenn-Wilson Construction Company</name> of <name type="place">Durham</name> are the general con-<lb/>
tractors for the <name type="place">Reactor Building</name>.  Work was started in January, 1952, and <lb/>
was scheduled for completion in November, 1952.</p>

<p>It is significant to note that not a single delay in construction has <lb/>
been encountered on this project because of material shortages or delayed <lb/>
deliveries.  High priorities, and even government directives, have been a <lb/>
vailable at any time they have been needed to secure delivery; however, <lb/>
there has been a shortage of labor, and the construction program appears to be <lb/>
a month at least behind schedule.</p>

<p>The second attached photograph shows the <name type="place">Reactor Building</name> in its present <lb/>
stage of construction.  One section of the concrete wall of the octagonally-shaped <lb/>

<pb n="3"/>
<seg><xref id="DONRstatus080152e.jpg" rend="new">
<figure entity="DONRstatus080152e"></figure></xref></seg>



central Reactor Room has been poured.  Part of the brick work of the exterior <lb/>
walls has been placed.  The concrete floors are poured except in the Observa-<lb/>
tion and Control Rooms.</p></item>

<item>4. PROSPECTUS

<p>Since completion of the Reactor Shield, efforts on the Reactor itself <lb/>
have gone toward collecting and testing components which will comprise the <lb/>
working assembly.  The actual installation and final testing cannot be ac-<lb/>
complished until the building is finished.  After the building is finished, <lb/>
from three to six months will be required to bring the Reactor into full <lb/>
operation.</p>

<p>As mentioned above, completion of the <name type="place">Reactor Building</name> was scheduled <lb/>
for November, 1952.  It is to be hoped that actual completion will be <lb/>
achieved by this date or shortly thereafter.</p>

</item></list>
<p>Copies to:  <name type="corporate">Burlington Mills</name><lb/>
<name type="person">Mr. W. D. Carmichael, Jr.</name> <lb/>
<name type="person">Mr. Gordon Gray</name><lb/>
<name type="person">Dean J. H. Lampe</name></p>
<pb ed="photographic enclosure 1" n=""/>
<p><seg><xref id="DONRstatus080152f.jpg" rend="new">
<figure entity="DONRstatus080152f"></figure></xref></seg></p>

<pb ed="photographic enclosure 2" n=""/>
<p><seg><xref id="DONRstatus080152g.jpg" rend="new">
<figure entity="DONRstatus080152g"></figure></xref></seg></p>



</div1>
</body>

</text></TEI.2>