Memorandum from Clifford Beck to Dr. A. C. Menius and Dr. Raymond L. Murray
Handwritten
6 pp.
June 10, 1952
MurNBsamplingtube061052



R. Memos
Donot type

June 10

Dr. Menius
Dr. Murray
re: Sampling tube in Reactor.

Please make the Following provisions in the reactor assembly
for a sampling tube and one bubble-type level indicator.
Enough room should still be left for another type level
indicator should we wish to incorporate one later.

this fitting should be so oriented that it "Faces straight up" the
conduit hole in the concrete.


[page 2]

This coupling should be so
oriented that it "Faces stright up" the
conduit hole in the concrered
Clifford Beck

Should go in "recombiner"
chamber.